المضائق والترسانات التركية: دعم نشط على مدار الساعة 24/7 | UTC: --:-- | IST: --:--

حلول هندسية قابلة للقياس لتحديات بحرية واقعية

اطلع على أبرز مشاريعنا السابقة متضمنة نوع العطل، الحل الهندسي المطبق، المواد المعتمدة، ونتائج الاختبارات والشهادات.

55m Superyacht Complete Refit & Teak DeckingYacht Refit & Decking
Private Owner (Monaco Flag) Tuzla Shipyard Zone

55m Superyacht Complete Refit & Teak Decking

  • Lloyd's Register Class Delivery
  • Duration: 18 Days
Challenge / Problem: Severe weathering and caulking degradation on 350 m² main deck, paired with generator acoustic vibration in engine room.
Engineered Solution: Laser surface profiling, 12mm FEQ Burma teak vacuum consolidation, Awlgrip polyurethane topcoat, and generator dynamic damper replacement.
Verified Outcome: Zero water ingress, 14 dB cabin acoustic noise reduction, delivered 2 days ahead of Mediterranean charter schedule.
Bulk Carrier 65,000 DWT Underwater Hull CCTV & Propeller PolishCommercial Vessel Diving
International Fleet Manager (Panama Flag) Ahirkapi Anchorage, Istanbul Bosphorus

Bulk Carrier 65,000 DWT Underwater Hull CCTV & Propeller Polish

  • DNV Class Approved In-Water Survey
  • Duration: 14 Hours
Challenge / Problem: Reported 0.8 knot cruising speed drop and elevated bunker consumption prior to Turkish Straits transit.
Engineered Solution: Class-certified diver deployment with live surface CCTV, Rupert Grade A hydraulic diamond micro-polishing of 4 blades, and sea chest clearing.
Verified Outcome: 5.2% fuel efficiency improvement and instant DNV class underwater survey clearance issued to Master at anchorage.
Chemical Tanker Lifeboat MSC.402(96) 5-Year Dynamic Load TestSafety & SOLAS
Tanker Fleet Management (Liberia Flag) Yalova Shipyard Basin

Chemical Tanker Lifeboat MSC.402(96) 5-Year Dynamic Load Test

  • ClassNK & Flag State Certified
  • Duration: 24 Hours
Challenge / Problem: Mandatory SOLAS MSC.402(96) 5-year dynamic brake load test and release mechanism overhaul due prior to sailing.
Engineered Solution: Rigging certified water load bags to 1.1x and 2.2x SWL, davit winch brake lining renewal, hydrostatic release gear overhaul, and dynamic drop trial.
Verified Outcome: Zero-defect international class compliance certificate issued within 24 hours without delaying vessel loading schedule.
Twin CAT C32 Marine Engine Overhaul & DiagnosticsMechanical Engineering
Commercial Fast Crew Vessel Kozan Marine Technical Workshop, Tuzla

Twin CAT C32 Marine Engine Overhaul & Diagnostics

  • Dyno Tested to OEM Tolerances
  • Duration: 6 Days
Challenge / Problem: Cylinder #4 misfire, high exhaust gas temperature (EGT), and significant power loss at 1800 cruising RPM.
Engineered Solution: Cylinder head remanufacturing, twin turbo dynamic balancing, electronic injector calibration via CAT ET diagnostic suite, and full sea trial load testing.
Verified Outcome: Full 1450 BHP nominal rating restored, EGT variance stabilized below 15°C across all cylinders, 12-month engineering warranty issued.

سلة طلب الأسعار